Skip to Main Content U.S. Department of Energy
Ecology

Evaluation of Steelhead Kelt Passage at Bonneville Dam

The objective of this project was to evaluate steelhead kelt passage through the second powerhouse at Bonneville Dam (B2) prior to the juvenile migration season.

Products

  • Weiland MA, J Kim, WT Nagy, and GE Johnson. 2009. Evaluation of Steelhead Kelt Passage into the Bonneville Dam Second Powerhouse Corner Collector Prior to the Juvenile Migration Seasons, 2007 and 2008. PNNL-18323, Pacific Northwest National Laboratory, Richland, WA.

Ecology

Additional Information

Point of Contact